ACTIVITIES
- Incoming materials-inspection
- Quality assurance and inspection of components sub-assemblies supplied by approved vendors.
- Line inspection of components, sub-assemblies manufactured on the shop floor.
- Final inspection and performance test.
- Inspection of packing and dispatch.
- Tools and instruments calibration and maintenance of test standard.
- Maintaining test records and inspection results.
The production department is totally responsible to achieve the required standards in quality of finished goods. For this purpose, the Quality Assurance Department inner acts assess the fine people. The quality Assurance Department has full powers to ensure that requisite step of quality are maintained.
INSPECTION OF IN-COMING MATERIAL
All raw materials and sub-assemblies viz. Fabrication plates and hardware etc. are procured as per approved technical specification or specified relevant standard.
Only materials as per Technical Specifications approved by quality Assurance department are accepted are stored in raw materials stores.
For the incoming materials the inward in-charge records the data in the in-Word register. The Quality Assurance Department is informed through in-slip and the incoming material is stored the receiving inspection area, until clearance by quality Assurance department.
100% inspection or alternatively as per sampling plan laid down is carried out in accordance with the Quality Assurance plan for each product.
The Quality Assurance Department arranges to send the test bars and other materials to a chemical and physical laboratory for chemical composition test. Material test certificate on various parts.
The part component sub- assemblies found to be OK are logged with OK report and signature of Quality Assurance Engineer.
Quality Assurance Engineer verified the size, Hydraulic pressure rating, material code, manufacturers emblem arrow mark for flow direction,
The accepted materials are stored in proper place.
|| TOP || |